Labor productivity in structural masonry construction

a case study based on the Unit Production Rate (UPR)

Authors

DOI:

https://doi.org/10.14488/1676-1901.v26i3.5618

Keywords:

Productivity, Unit Production Rate, Structural Masonry, Case Study, Social Housing

Abstract

Despite government efforts to reduce Brazil's housing deficit, this indicator remains high, highlighting the ongoing need for large-scale housing production in a sector characterized by low labor productivity. This study aims to measure and analyze labor productivity during the construction of structural masonry in a residential project located in Pelotas, Rio Grande do Sul, Brazil. Daily data on labor hours and completed work were collected from two masonry crews to calculate the daily, cumulative, and potential Unit Production Rate (UPR). These values were subsequently compared with the benchmark indices provided by the Brazilian National System for Construction Costs and Indexes (it is a set of construction estimates for building productivity and material consumption, mandatory for construction companies that obtain public finance for housing developments through official lending organizations, SINAPI/July 2026). The results showed that Crew B outperformed Crew A, with average cumulative UPR values of 0.85 and 0.90 labor-hours per square meter (Hh/m²), respectively. Both values were lower than the SINAPI reference value of 1.29 Hh/m², indicating higher labor productivity than the national benchmark. The findings suggest that the observed differences in productivity were associated not only with the characteristics of the construction process but also with organizational factors, including changes in masonry module dimensions, work interruptions, and the workers' prior experience. This study contributes empirical evidence to support workforce management in similar projects, enabling more effective labor allocation and production planning.

Downloads

Download data is not yet available.

Author Biography

Mozzara Oliveira da Fonseca, Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, RS, Brasil.

Possui graduação em Engenharia Civil pela Universidade Federal de Pelotas (2020), Mestrado em Engenharia Civil, com área de concentração em Construção Civil, pela Universidade Federal de Santa Catarina (2023), MBA em Gestão da Qualidade (2023) e Curso Técnico em Edificações pelo Instituto Federal de Educação, Ciência e Tecnologia Sul-rio-grandense (2015). Atualmente, é Doutoranda em Engenharia Civil: Construção e Infraestrutura (PPGCI) na Universidade Federal do Rio Grande do Sul, na área de Gestão e Economia da Construção com foco na filosofia Lean e Qualidade. É coordenadora do projeto de pesquisa Gestão da qualidade, produção e desempenho na construção civil: análise de custos, perdas e retrabalho na UFPel. Foi Professora Substituta no Centro de Engenharias da Universidade Federal de Pelotas (CEng/UFPel). Durante a graduação, foi bolsista de iniciação científica (PROBIC/FAPERGS) na área de Recursos Hídricos. Atuou em regime celetista como responsável pelo setor de qualidade em obras de habitações de interesse social, com experiência no Programa Brasileiro da Qualidade e Produtividade do Habitat (PBQP-H) e no Sistema de Avaliação da Conformidade de Empresas de Serviços e Obras da Construção Civil (SiAC). Possui ainda experiência na execução de obras de condomínios residenciais e no desenvolvimento de projetos arquitetônicos, hidráulicos, elétricos e de prevenção contra incêndio.

References

ALJARALLAH, N. et al. Significant factors affecting the quality of housing infrastructure project construction in Saudi Arabia using PLS-SEM. Sustainability, v. 15, n. 20, p. 14998, 2023.

ALVES, A. C.; CAMPOS, V. R. Impacto na produtividade decorrente da utilização de horas extras: um estudo de caso numa subestação coletora de energia. In: SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO, 13., 2023. Anais [...]. Porto Alegre: ANTAC, 2023. p. 1-10.

ASSAAD, R.; EL-ADAWAY, I. H.; ABOTALEB, I. S. Predicting project performance in the construction industry. Journal of Construction Engineering and Management, v. 146, n. 5, p. 04020030, 2020.

ARAÚJO, L. O. C. Método para previsão e controle da produtividade da mão de obra na execução de fôrmas, armação, concretagem e alvenaria. 2000. 385p.

Dissertação (mestrado) – Universidade de São Paulo, São Paulo (SP).

BEZERRA, C. G. D. R. et al. Produtividade na construção civil: análise comparativa da utilização de kits hidráulicos em edifícios na cidade de Manaus. Contribuciones a Las Ciencias Sociales, v. 17, n. 13, p. e13958, 2024.

BONESI-DE LUCA, F. M. et al. Método para implementação do trabalho padronizado como elemento adicional do planejamento e controle baseado em localização. Ambiente Construído, v. 24, jan./dez. 2024.

COLLIS, J.; HUSSEY, R. Pesquisa em administração: um guia prático para alunos de graduação e pós-graduação. 2. ed. Porto Alegre: Bookman, 2005.

COOPER, D. R.; SCHINDLER, P. S. Métodos de pesquisa em administração. 12. ed. Porto Alegre: AMGH, 2016.

CORREA, M. I. F.; BRANDSTETTER, M. C. G. de O.; ROMAGNOLI, L. D. S. C. Modelos de prognóstico de produtividade na construção civil: caracterização e análise crítica comparativa em estudo de caso. Ambiente Construído, v. 25, p. e145278, 2025.

COSTA, L. S. D. et al. Atrasos e custos extras na construção civil: evidências e análises do setor brasileiro. Revista Produção Online, v. 25, n. 4, p. 1, 2025.

GIONA, R. Análise da influência da industrialização na produtividade de mão de obra na produção de painéis pré-fabricados de alvenaria estrutural. 2013. 96 f. Dissertação (Mestrado) – Universidade Federal de Santa Catarina, Centro Tecnológico, Programa de Pós-Graduação em Engenharia Civil, Florianópolis, 2013.

HASSAN, A.; RIAZ, A. Analysis of skilled labor shortage in the construction industry of developing countries. Building Engineering, v. 3, n. 1, p. 2054-2054, 2024.

HUBERT, F. N.; SANTOS, F. F. dos; SOUSA, M. A. B. de. Estudo de produtividade em edificações de paredes de concreto moldadas in loco. Revista Livre de Sustentabilidade e Empreendedorismo (RELISE), v. 8, n. 6, p. 135-161, nov./dez. 2023.

JIAN, F. et al. Critical factors affecting construction labor productivity: a systematic review and meta-analysis. Buildings, v. 15, n. 14, p. 2463, 2025.

KHATATBEH, A. A. Quantifying the impact of ISO 9001 standard on the project and engineering management and success factors; a case of construction industry. Engineering, Construction and Architectural Management, v. 30, n. 6, p. 2564-2581, 2023.

KIESER, L. dal C.; BECK, L. M.; DORNELES, J. B. A produtividade da mão de obra no sistema construtivo de parede de concreto in loco: estudo de caso utilizando forma metálica. In: SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO, 14., 2025. Anais [...]. Porto Alegre: ANTAC, 2025.

LEE, T. Y.; AHMAD, F.; SARIJARI, M. A. Current status and future research trends of construction labor productivity monitoring: a bibliometric review. Buildings, v. 13, n. 6, p. 1479, 2023.

LEE, C.; WON, J. Analysis of construction productivity based on construction duration per floor and per gross area, with identification of influential factors. Journal of Civil Engineering and Management, v. 27, n.3, p. 203-216, 2021.

LIBRAIS, C. F.; SOUZA, U. E. L. Produtividade da mão-de-obra no assentamento de revestimento cerâmico interno de parede. São Paulo: EPUSP, 2002. (Boletim técnico).

MARQUES, W. et al. Filosofia Lean Manufacturing: possibilidades em um restaurante autosserviço. Revista Produção Online, v. 25, n. 3, p. 5231-5231, 2025.

MELO, S. S. et al. Produtividade no canteiro de obra: como consequência da organização e planejamento. Revista Científica Online, v. 15, n. 1, 2023.

MULLER, H. M. B.; RODEGHERI, P. M.; PALIARI, J. C. Produtividade da mão de obra na execução de alvenaria estrutural em edifício residencial. In: SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO, 11., 2019, Londrina. Anais [...]. Porto Alegre: ANTAC, 2019.

ONG'ONDO, C. B.; GWAYA, A. O.; MASU, S. Establishing a performance efficiency index for construction projects in Kenya. Journal of the Kenya National Commission for UNESCO, 2022.

OLANREWAJU, A. L.; ABDUL-AZIZ, A.-R. Building maintenance processes and practices: the case of a fast developing country. Cham: Springer, 2014.

RAZAK, N. N. A. et al. Project quality plan (PQP) implementation during site inspection. Journal of Engineering and Applied Sciences, v. 12, n. 4, p. 803-07, 2017.

ROMAN, H. R. et al. Construindo em alvenaria estrutural. Florianópolis: Editora da UFSC, 1999.

SANTIAGO, L. R. et al. Patologias na alvenaria estrutural de blocos de concreto. Revista Científica Multidisciplinar Núcleo do Conhecimento, ano 3, v. 2, n. 9, p. 70-93, set. 2018.

SANTOS, D. G.; SANTOS, C. O. Identificação de problemas nos processos construtivos a partir do índice de produtividade. In: SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO, 5., 2007, Campinas. Anais [...]. Campinas: ANTAC, 2007.

SEBBEN, T. et al. Desempenho térmico de habitação emergencial por simulação evolutiva. PARC Pesquisa em Arquitetura e Construção, Campinas, v. 13, p. e022015, 2022.

SILVA, A. C. B. et al. Engenharia de métodos no tratamento dos dados de indicadores de qualidade: um estudo de caso em uma empresa do setor automobilístico. Revista Produção Online, v. 23, n. 2, p. 4915-4915, 2023.

SOUZA, U. E. L. Como medir a produtividade da mão de obra na construção civil. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 8., 2000, Salvador. Anais [...]. Salvador: ANTAC, 2000.

SOUZA, U. E. L.; MORASCO, F. G.; RIBEIRO, G. N. B. Manual básico de indicadores de produtividade na construção civil. Brasília: CBIC, 2017. v. 1

SOUZA, A. Z.; ANTUNES, E. G. P. Análise de fatores que interferem na produtividade da construção civil. Criciúma: UNESC, dez. 2019.

TAMIETTI, Gabriel. Brasil registra déficit habitacional de 6 milhões de domicílios. Disponível em: https://fjp.mg.gov.br/brasil-registra-deficit-habitacional-de-6-milhoes-de-domicilios/, 2024.

THOMAS, H. R.; YIAKOUMIS, I. Factor model of construction productivity. Journal of Construction Engineering and Management, v. 113, n. 4, p. 623-639, 1987.

THOMAS, H.R.; SANDERS, S.R.; BILAL, S. Comparison of labor productivity. Journal of Construction Engineering and Management, v. 118, n. 4, p. 635-650, Dec. 1992.

TORRES, L. N. et al. Desenvolvimento de um modelo de simulação no ARENA® visando o aumento da produtividade em uma usina de beneficiamento de minério de ferro. Revista Produção Online, v. 21, n. 2, p. 576-608, 2021.

VALADARES, A. B.; SILVA, A. L. S.; SILVEIRA, H. E. Gestão de mão de obra na construção civil e sua importância para a eficiência na produção: uma revisão. Revista Multidisciplinar do Nordeste Mineiro, v. 4, n. 1, 2024.

YIN, R. K. Case Study Research and Applications: Design and Methods. 6. ed. Thousand Oaks: SAGE Publications, 2018.

Published

2026-10-06

How to Cite

Fonseca, M. O. da. (2026). Labor productivity in structural masonry construction: a case study based on the Unit Production Rate (UPR). Revista Produção Online, 26(3), 5618. https://doi.org/10.14488/1676-1901.v26i3.5618

Issue

Section

Papers

Similar Articles