Process management and methods engineering for reducing time losses in the transport of liquid metal in a primary aluminum industry
DOI:
https://doi.org/10.14488/1676-1901.v26i4.5167Keywords:
Time losses, Chronoanalysis, Process mapping, Primary aluminumAbstract
Liquid metal transport is the link between the reduction and casting areas in a primary aluminum plant and, since it allows no intermediate inventory, any non-productive time within the cycle translates directly into lost capacity. This paper aims to reduce the time losses arising from waiting and unnecessary movement in this activity, by integrating BPMN process mapping with time and motion study. A single case study with a qualitative-quantitative approach was conducted at a plant located in Barcarena, Pará, Brazil. The activity was mapped in its current state, broken down into 26 elements and timed using the repetitive reading method, with four operators over a two-week period; standard times were determined for both existing cycles — to the casting area and to an external customer — and compared against the operation's takt time. Losses were concentrated in queue waiting and in the travel required for chemical analysis. Installing a second skimming platform eliminated the queue, cutting 5 minutes and 26 seconds from the cycle and raising productivity of the transport to the casting area by 15.5%, while relocating the chemical analysis to an adjacent laboratory reduced a further 1 minute and 38 seconds in the customer cycle, as verified in testing. The improvements were consolidated into a redesigned process map.
Downloads
References
ABAL – ASSOCIAÇÃO BRASILEIRA DO ALUMÍNIO. Alumínio – Cadeia Primária. Disponível em: https://abal.org.br/aluminio/cadeia-primaria/. Acesso em: 20 jan. 2024.
BARNES, R. M. Estudo de movimentos e de tempos: projeto e medida do trabalho. São Paulo: Edgard Blücher, 1986.
BRUYNE, P. de; HERMAN, J.; SCHOUTHEETE, M. de. Dinâmica da pesquisa em ciências sociais. Rio de Janeiro: Francisco Alves Editora, 1991.
CAI, J. Y.; TSENG, C. Y.; HUANG, T. S. Work Study and Simulation Optimization of Supply-demand Balancing in the Moth Orchid Plant Factory. Procedia Manufacturing, v. 11, p. 1966-1975, 2017. DOI: https://doi.org/10.1016/j.promfg.2017.07.347
COELHO, L. L.; GONÇALVES, A. T. P. Mapeamento do Fluxo de Valor (MFV) aplicado à operação logística de uma distribuidora do Agreste Pernambucano. Revista Produção Online, v. 25, n. 1, e5284, 2025. DOI: https://doi.org/10.14488/1676-1901.v25i1.5284
CORRÊA, L. E. A. Estudo de tempos e movimentos. Revista Latino-Americana de Inovação e Engenharia de Produção, v. 11, n. 19a, p. 22-42, 2023. DOI: https://doi.org/10.5380/relainep.v11i19a.88269
DUMAS, M.; LA ROSA, M.; MENDLING, J.; REIJERS, H. A. Fundamentals of business process management. Berlin: Springer, 2013.
FREIVALDS, A.; NIEBEL, B. Niebel's Methods, Standards, and Work Design. 13. ed. New York: McGraw-Hill, 2013.
GIL, A. C. Como elaborar projetos de pesquisa. São Paulo: Atlas, 2008.
IOVANELLA, A. Exploiting network science in business process management: A conceptual framework. Chaos, Solitons and Fractals, v. 178, art. 114344, 2024. DOI: https://doi.org/10.1016/j.chaos.2023.114344
JUSTA, M. A. O. da; LAGO NETO, J. C. do; SILVA, R. O. da. Aplicação das técnicas de cronoanálise e mapa de fluxo de valor para a melhoria da capacidade de produção de uma fábrica do setor automotivo na Zona Franca de Manaus. Revista Produção Online, v. 25, n. 3, e5353, 2025. DOI: https://doi.org/10.14488/1676-1901.v25i3.5353
JUSTA, M. A. O. da; SILVA, R. O. da. A aplicabilidade da metodologia Business Process Model and Notation (BPMN) para a melhoria dos processos de uma fábrica situada na Zona Franca de Manaus. Revista Produção Online, v. 26, n. 2, e5546, 2026. DOI: https://doi.org/10.14488/1676-1901.v26i2.5546
LUCIANO, E. L. L. et al. Mapeamento do fluxo de valor para caracterização do takt time como indicador de performance aplicado ao setor cafeeiro. Revista Univap, v. 29, n. 63, 2023. DOI: https://doi.org/10.18066/revistaunivap.v29i63.4380
MARTINS, P. G.; LAUGENI, F. P. Administração da Produção. 2. ed. São Paulo: Saraiva, 2005.
MOKTADIR, M. A.; AHMED, S.; TUJ ZOHRA, F.; SULTANA, R. Productivity Improvement by Work Study Technique: A Case on Leather Products Industry of Bangladesh. Industrial Engineering & Management, v. 6, n. 1, p. 1-11, 2017. DOI: 10.4172/2169-0316.1000207
MUNDEL, M. E. Estudo de movimentos e tempos – princípios e práticas. São Paulo: Mestre Jou, 1966.
NABI, F.; MAHMUD, R.; ISLAM, M. Improving Sewing Section Efficiency through Utilization of Worker Capacity by Time Study Technique. International Journal of Textile Science, v. 4, n. 1, p. 1-8, 2015. DOI: 10.5923/j.textile.20150401.01
NANDAKUMAR, N.; SAALEESHYA, P. G.; HARIKUMAR, P. Bottleneck identification and process improvement by Lean Six Sigma DMAIC methodology. Materials Today: Proceedings, v. 24, p. 1217-1224, 2020. DOI: https://doi.org/10.1016/j.matpr.2020.04.436
NOOR, N. et al. Optimization Assembly Process base on Motion Time Study in Manufacturing: Study Case and Implementation. Journal of Applied Science and Agriculture Industry, v. 9, n. 21, p. 1-12, 2014. DOI: 10.13140/RG.2.1.4430.2888
NOVOA, C. M.; MENDEZ, F. Bootstrap methods for analyzing time studies and input data for simulations. International Journal of Productivity and Performance Management, v. 58, n. 5, p. 460-479, 2009. DOI: https://doi.org/10.1108/17410400910965724
OCHOA, C.; MURCIA, H.; FUCINOS, R.; DOMÍNGUEZ, K. New implementation of Work Sampling Analysis for validating the Present Idle Time Indicator of Maintenance and Ship Repairing Business Line of Cotecmar. Ship Science & Technology, v. 10, n. 20, p. 9-18, 2017. DOI: https://doi.org/10.25043/19098642.145
OLIVEIRA, A. M.; GALO, N. R.; COSTA JÚNIOR, N. D. Mapeamento do fluxo de valor no setor de suprimentos de uma indústria de aço. Revista Produção Online, v. 23, n. 3, e4978, 2023. DOI: https://doi.org/10.14488/1676-1901.v23i3.4978
PEINADO, J.; GRAEML, A. R. Administração da Produção. Curitiba: UnicenP, 2007.
SORDI, J. O. de. Gestão por processos: uma abordagem da moderna administração. 6. ed. [S. l.]: Alta Books, 2022.
SOUSA, M. J. de L.; CORREIA, A. M. M.; GONÇALVES, H. S. Estudo de tempos e movimentos: uma análise em uma distribuidora de alimentos. Revista Produção Online, v. 21, n. 1, p. 259-287, 2021. DOI: https://doi.org/10.14488/1676-1901.v21i1.4217
TAPPING, D.; SHUKER, T. Lean Office: gerenciamento do fluxo de valor para áreas administrativas – 8 passos para planejar, mapear e sustentar melhorias lean nas áreas administrativas. São Paulo: Editora Leopardo, 2010.
WAGENAAR, B. H. et al. Wait and consult times for primary healthcare services in central Mozambique: a time-motion study. Global Health Action, v. 9, n. 1, p. 1-10, 2016. DOI: https://doi.org/10.3402/gha.v9.31980
WU, S. et al. Incorporating motion analysis technology into modular arrangement of predetermined time standard (MODAPTS). International Journal of Industrial Ergonomics, v. 53, n. 1, p. 291-298, 2016. DOI: https://doi.org/10.1016/j.ergon.2016.03.001
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Revista Produção Online

This work is licensed under a Creative Commons Attribution 4.0 International License.
The Journal reserves the right to make spelling and grammatical changes, aiming to keep a default language, respecting, however, the style of the authors.
The published work is responsibility of the (s) author (s), while the Revista Produção Online is only responsible for the evaluation of the paper. The Revista Produção Online is not responsible for any violations of Law No. 9.610 / 1998, the Copyright Act.
The journal allows the authors to keep the copyright of accepted articles, without restrictions
This work is licensed under a Creative Commons License .