Risk management in the construction of a 500/345kV transmission line
a casa study
DOI:
https://doi.org/10.14488/1676-1901.v26i1.5524Keywords:
Risk Management, Monte Carlo Simulation, Transmission Lines, Electric Power SectorAbstract
The development of a country is closely linked to the demand for electricity and the available energy sources that constitute its energy matrix. In this process, a robust infrastructure is required to transport energy from the power plant to the end consumer, with numerous risks associated with each stage of construction. The objective of this study was to evaluate the risk management process in the construction of 500/345kV transmission lines by combining qualitative and quantitative approaches, literature review, project documents to identify risk categorization and response plans, and data analysis using Monte Carlo simulation for critical path activities in the schedule. Risks were categorized based on their probability and impact levels. It was observed that the risk management process was effective, and the simulation demonstrated probabilities aligned with reality. As a result, response plans were proposed for the identified risks, and lessons learned were documented at the end of the project.
Downloads
References
ALMEIDA, A. B. D. Risco e gestão do risco: questões filosóficas subjacentes ao modelo técnico conceptual. Coimbra, 2011. Disponível em: http://hdl.handle.net/10316.2/36045. Acesso em: 27 nov. 2022.
AGÊNCIA NACIONAL DE ENERGIA ELÉTRICA (ANEEL). Agência Nacional de Energia Elétrica. Brasília, DF, 2022. Disponível em: https://www.gov.br/aneel. Acesso em: 8 abr. 2023.
ARAIBI, Alaa Salahuddin et al. Enhancing risk management: leveraging the likelihood/severity matrix for effective risk assessment and mitigation in the electrical and electronic sector. Al-Khwarizmi Engineering Journal, v. 20, n. 3, p. 59-70, set. 2024.
ARAÚJO, Cidália; PINTO, Emília M. F.; LOPES, José; NOGUEIRA, Luís; PINTO, Ricardo. Estudo de caso: métodos de investigação em educação. Braga: Universidade do Minho, Instituto de Educação e Psicologia, 2008.
DINSMORE, Paul C.; CAVALIERE, Adriane. Como se tornar um profissional em gerenciamento de projetos. 4. ed. rev. e ampl. Rio de Janeiro: Qualitymark, 2011.
EMPRESA DE PESQUISA ENERGÉTICA (EPE). EPE – Empresa de Pesquisa Energética. Brasília, DF, 2019. Disponível em: https://www.epe.gov.br/pt. Acesso em: 28 dez. 2022.
EMPRESA DE PESQUISA ENERGÉTICA (EPE). Estudos para a licitação da expansão da transmissão: PET/PELP. Brasília, DF, 2022. Disponível em: https://www.epe.gov.br/pt/publicacoes-dados-abertos/publicacoes/programa-de-expansao-da-transmissao-plano-de-expansao-de-longo-prazo-pet-pelp. Acesso em: 28 dez. 2022.
FONTES, A. H. D. M. Gerenciamento de riscos aplicado a escavações de túneis. 2018. Dissertação (Mestrado em Gestão Empresarial) – Fundação Getulio Vargas, Salvador, 2018.
FURNAS. Furnas Centrais Elétricas. Rio de Janeiro, 2022. Disponível em: https://www.furnas.com.br. Acesso em: 16 nov. 2022.
PROJECT MANAGEMENT INSTITUTE (PMI). Um guia do conhecimento em gerenciamento de projetos (Guia PMBOK®). 6. ed. Newtown Square: PMI, 2017.
HOCHHEIM, N.; HOCHHEIM, G. A.; MUTTI, C. D. N. Simulação Monte Carlo considerando dependência entre variáveis para análise da variabilidade do método involutivo. In: CONGRESSO BRASILEIRO DE ENGENHARIA DE AVALIAÇÕES E PERÍCIAS, 19., 2017, Foz do Iguaçu. Anais [...]. Foz do Iguaçu: COBREAP, 2017.
HOLANDA, A. B. de. App Aurélio Digital. 5. ed. [S.l.]: Companhia Brasileira de Educação e Sistemas de Ensino S.A., 2020.
INSTITUTO BRASILEIRO DO MEIO AMBIENTE E DOS RECURSOS NATURAIS RENOVÁVEIS (IBAMA). Solicitar licenciamento ambiental federal. Brasília, DF, 2023. Disponível em: https://www.gov.br/pt-br/servicos/solicitar-licenciamento-ambiental-federal. Acesso em: 19 mar. 2023.
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO). ISO 31000:2009: gestão de riscos. Genebra: ISO, 2009.
ITAIPU BINACIONAL. Itaipu Binacional. Foz do Iguaçu, 2022. Disponível em: https://www.itaipu.gov.br. Acesso em: 16 nov. 2022.
JOIA, L. A. et al. Gerenciamento de riscos em projetos. 3. ed. Rio de Janeiro: FGV, 2013.
SALLES JUNIOR, C. A. C. et al. Gerenciamento de riscos em projetos. Rio de Janeiro: FGV, 2010.
LIMA, A. R. Análise e gestão de riscos das ocupações de faixas de linhas de transmissão: estudo de caso da Vila Alta Tensão. 2012. Dissertação (Mestrado) – Universidade Federal de Ouro Preto, Ouro Preto, 2012.
NETO, J. R. B. Gerenciamento de riscos em ativos de empresas de transmissão de energia do sistema elétrico brasileiro: uma aplicação na Chesf. 2005. Dissertação (Mestrado) – Universidade Federal de Pernambuco, Recife, 2005.
OPERADOR NACIONAL DO SISTEMA ELÉTRICO (ONS). Mapa do sistema de transmissão: horizonte 2024. Rio de Janeiro, 2022. Disponível em: https://www.ons.org.br/paginas/sobre-o-sin/mapas. Acesso em: 18 dez. 2022.
STANSBURY, Nicole et al. Risk-based quality management: a case for centralized monitoring. Therapeutic Innovation and Regulatory Science, v. 59, n. 2, p. 199-210, mar. 2025.
VIEIRA, E. Gerenciando Projetos na Era de Grandes Mudanças - Uma breve abordagem do panorama atual. PMI Journal – PMI-RS, [Porto Alegre], v. 3, p. 7-16, 2002.
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Revista Produção Online

This work is licensed under a Creative Commons Attribution 4.0 International License.
The Journal reserves the right to make spelling and grammatical changes, aiming to keep a default language, respecting, however, the style of the authors.
The published work is responsibility of the (s) author (s), while the Revista Produção Online is only responsible for the evaluation of the paper. The Revista Produção Online is not responsible for any violations of Law No. 9.610 / 1998, the Copyright Act.
The journal allows the authors to keep the copyright of accepted articles, without restrictions
This work is licensed under a Creative Commons License .